
Professional Concrete Installation
Driveways, patios, walkways, and structural slabs — done right the first time.
Scope of work
What's included.
Every concrete project gets the same standard of prep, materials, and finish work — line-item-quoted upfront.
- Site grading + sub-base prep
- Compacted aggregate base
- Rebar or fiber reinforcement (job-dependent)
- Forming + finishing crew on-site
- Control joint cutting (saw-cut, not hand-tooled)
- Curing compound applied
Materials & brands
Premium only. No contractor-grade shortcuts.
- 4000-PSI ready-mix
- Decorative options: broom, stamp, exposed aggregate
- Integral color + acid stain
Manufacturer certifications & warranty documentation available on request.
How we work
The concrete process.
- STEP 01
Layout + permit check
We confirm setbacks and pull permits if your county requires them.
- STEP 02
Prep + form
Excavate, compact base, set forms to grade.
- STEP 03
Pour day
Concrete placed, screeded, floated, and finished by experienced crew. Steel-troweled or broom finish.
- STEP 04
Cure + seal
Cure compound day-of; optional sealer after 28 days.
Recent concrete work
Built right. Photographed proud.





Free, on-site estimates with no obligation. Every quote is itemized — no upsells, no surprise charges, no contractor-grade substitutions.
Financing available
Premium work. Payments that fit.
See personalized monthly payment options through our financing partner, Hearth, before you commit to anything.
- Pre-qualify in minutes — no impact to your credit score
- Loan amounts up to $250,000
- Funding in 1–3 days
- No prepayment penalties · No home equity required
Financing is offered through Hearth and its lending partners and is subject to credit approval. Terms vary by lender. Exotic Exteriors Company LLC does not originate loans.
Frequently asked
Concrete questions, answered.
- How thick should a driveway be?
- 4" minimum for cars, 5–6" if you'll park trucks or RVs. We'll spec it to your use case.
- Will my new concrete crack?
- All concrete develops hairline cracks — control joints are cut to direct where. Properly prepped slabs avoid structural cracking.
- Can I drive on it the next day?
- Foot traffic at 24 hrs, light vehicles at 7 days, heavy vehicles at 28 days. We mark off the area during cure.
Ready to start your concrete project?
Free estimates. Itemized quotes. No-obligation walkthroughs.

